AMOTIA is a partnership of over 20 multinational transportation firms. These industry leaders have joined together to better serve transportation agencies, and to
be the unified voice of
the private sector in management and operation of transportation
infrastructure assets.

»CLICK HERE to download an AMOTIA membership application


“[The] ultimate goal of asset management ...
[is] to look at all elements of the transportation system comprehensively, rather than as separate pieces, and to achieve your performance goals by analyzing the trade-offs between various alternative funding scenarios.”

– Jim McDonnell,
   AASHTO


Subscribe to AMOTIA’s newsletter and stay current with the latest projects.


Home
| Newsletter | Mission | Members | Resources | Case Studies | Contact Us

Off Turnpike Operations, Florida
florida turnpike

Project Location: Turnpike assets located througout Florida

Date: May 2000 through 2009

Client: Office of Toll Operations, Florida’s Turnpike Enterprise, P.O. Box 613069,
Ocoee, FL 34778

Scope and Asset Description: Jorgensen presently holds a three-year contract with the Office of Toll Operations (OTO) of the Florida Department of Transportation to maintain 24 separate toll facilities across the State of Florida. These facilities include the Sunshine Skyway Bridge in Tampa, the new Garcon Bridge near Pensacola and the Alligator Alley facilities in south Florida, and are not part of Florida’s Turnpike Enterprise, but are managed under their authority. Contractor activities include preventive maintenance for all existing assets (HVACC, mechanical, electrical, etc.), rehabilitation projects, and special maintenance requirements. Jorgensen is performing 90% of the work with in-house staff, and utilizes specialty subcontractors to perform the remaining activities. In addition to the routine preventive maintenance performed by Jorgensen Local Area Technicians, Jorgensen responds to work requests issued by the client. These requests cover troubleshooting, emergency repair as well as planned reconditioning and rehabilitation of depleted assets. As part of this contract, Jorgensen has developed a comprehensive Toll Facility Preventive Maintenance program, measurably improving the condition of the facilities and reducing the long-term costs of toll facility ownership.

Benefits: The implementation of this strategy by the client has seen a great improvement in the reliability of the equipment through reduced number of emergency call-outs as well as overall equipment failures. This is due to the contractor’s efforts in carrying out routine preventive maintenance instead of providing reactive coverage as was the case prior to contract implementation. Cost savings are not documented in absolute terms; however, the budgeted amount for this effort with adjustment for inflation has remained relatively constant over the contract period.

Disadvantages: none

Lessons Learned and Suggestions: Under some situations work may be estimated but the client decides not to follow through for various reasons. As a result the contractor has no way to recover initial costs to investigate problems or design a plan for action.

Innovations: Several innovations have been implemented during the past six years:

References—documents or personnel: Santiago Alvarez, Facilities Administrator, 954-975-4855, santiago.alvarez(at)dot.state.fl(dot)us

Quotes: During FDOT sponsored maintenance meetings, Turnpike officials have noted several reasons why this contract works:


Home | Newsletter | Our Mission | Members | Resources | Case Studies | Contact Us

AMOTIA | 300 North Washington Street, Suite 605 | Alexandria, Virginia | Phone: 202.253.0331
Email: info@amotia.org | ©2011, Association for Management and Operations of
Transportation Infrastructure Assets. All Rights Reserved.